Commercial Processing Workload (CPW)

CPW

IBM's relative capacity rating for processors running IBM i, and the number that shows how much transaction headroom a Power server has left. IBM quotes it for the largest IBM i partition a machine allows, which on several Power 11 processor options is capped at 4 cores.

Stands forCommercial Processing Workload
What it ratesIBM i transaction capacity
Kind of numberRelative, not absolute
IBM sourcePower11 Performance Report, 8 July 2025

What does CPW tell you?

CPW is a size label for IBM i work. Think of it like the weight rating on a pickup truck. It does not tell you how fast the truck goes. It tells you roughly how much load it can carry before it struggles. CPW does the same job for the work IBM i shops actually run: lots of short jobs hitting a database at the same time.

IBM names three things the CPW rating is

  1. A database testA range of database applications, with updates and queries of mixed difficulty, running under commitment control and journaling.
  2. A crowd testMany users at once, all running the same group of programs against the same data.
  3. A steady-state approximationA reasonable stand-in for how a normal, database-heavy business application performs compared with another system.

Wording follows the "What the CPW rating is" list in the IBM i Performance Capabilities Reference.

What does CPW not tell you?

IBM is unusually blunt about the limits. CPW is built from one workload IBM keeps in-house, so it is a comparison tool, not a promise about your software.

  • It is not an indication of how a system will perform for any one customer situation.
  • It is not a test of ad-hoc query performance.
  • It is not a test of single-threaded batch throughput, so it will not tell you whether a nightly job finishes inside a 4 hour window.
  • It cannot represent the execution speed of any single thread. A capacity number and a speed number are different things.

IBM's own words: the CPW rating is "rigidly defined as a relative capacity metric for rough model comparisons and relative CPU consumption" and is "NOT representative of any specific environment". For sizing a real workload IBM points you at the IBM Systems Workload Estimator instead.

Why does a bigger server sometimes show less CPW?

This is the trap worth knowing before you buy. IBM publishes CPW next to a column called LPAR size, which is the number of cores the IBM i partition was given. On the IBM Power S1122, only the 8-core processor option lets an IBM i partition use all 8 cores. Every larger processor option holds the IBM i partition to 4 cores. So the 8-core machine carries nearly twice the IBM i CPW of the 20-core machine, even though the 20-core machine has more silicon in it.

IBM i CPW on the IBM Power S1122, by processor option

8-core option, 8-core IBM i partition236,400 CPW
20-core option, 4-core IBM i partition123,400 CPW
32-core option, 4-core IBM i partition123,800 CPW
48-core option, 4-core IBM i partition123,800 CPW
60-core option, 4-core IBM i partition117,100 CPW

Figures from Section 3a of the IBM Power11 Performance Report, 8 July 2025. The extra cores on the larger options are not wasted; they are available to AIX and Linux partitions on the same machine, including a Linux partition driving accelerator cards. IBM quotes CPW on maximum configurations and supplies all performance estimates as is, with no warranty.

Does CPW measure AI inference?

No, and this is where people get tripped up. CPW rates how much IBM i database and transaction work a processor can carry. An AI model answering a question is a different kind of work on different silicon, and IBM rates that in trillions of operations per second. On IBM Power the Spyre Accelerator sits in a Red Hat Enterprise Linux partition, not in IBM i, so the model's speed never appears in the server's CPW figure at all.

CPW is still worth checking before an AI project, just for a different reason. It tells you whether the IBM i side has capacity left to serve the data a model keeps asking for. It does not tell you how fast the model will answer.

How is CPW different from rPerf?

The same IBM report carries both numbers, which is why they get mixed up. They are separate scales for separate operating systems.

CPW and rPerf side by side

CPWrPerf
Rates systems runningIBM iIBM UNIX systems with AIX
How IBM derives itMeasurements of a database workload held inside the IBM i Systems Performance groupAn analytical model using IBM internal workloads, OLTP and SPEC benchmarks
Reference pointSelf-referential across IBM i systemsThe IBM eServer pSeries 640 is rated 1.0
Disk and network I/OThe workload itself uses commitment control and journalingThe model simulates CPU, cache and memory, but not disk or network I/O
What IBM says it is good forRough model comparisons and relative CPU consumptionApproximating relative IBM UNIX commercial processing performance

Both definitions come from the Notes on Performance Estimates page of the IBM Power11 Performance Report, 8 July 2025. The two scales are built separately for different operating systems, so one does not convert into the other.